Roche ACCU-CHEK Inform II Manual del operador Pagina 83

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 192
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 82
Linearity Testing
83
Performing a linearity test
Overview of test procedure
A linearity test comprises the following steps:
n Check the lot number of the linearity solutions.
n Check the lot number of the test strips.
n Perform the test with a minimum of three linearity
solutions.
Starting a linearity test
The following description assumes that the meter is
powered on and the main menu is displayed.
1 Touch in the Main Menu to open the Main
Menu 2 screen.
2 Touch Linearity to start the linearity test. The
Linearity Test screen opens.
Vista de pagina 82
1 2 ... 78 79 80 81 82 83 84 85 86 87 88 ... 191 192

Comentarios a estos manuales

Sin comentarios