Roche ACCU-CHEK Inform II Manual del operador Pagina 100

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 192
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 99
Initial Startup
100
Installing the battery pack
1 Loosen the screws on the battery pack until they
are protruding about 2/10 inch.
2 Position the battery pack alongside the meter so
that the plug connector is level with the socket
inside the meter.
3 Plug the connector plug into the socket.
4 If necessary, use a suitable tool (such as a Torx
screwdriver) to push the plug completely into the
socket.
Vista de pagina 99
1 2 ... 95 96 97 98 99 100 101 102 103 104 105 ... 191 192

Comentarios a estos manuales

Sin comentarios