Roche Accu-Chek Aviva Información técnica Pagina 70

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 282
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 69
68
iNOTE
If a test strip error occurs, remove and discard the used test strip and repeat the test with a new test
strip.
• Be careful not to put any fluids into the test strip slot.
When the Control Level screen is displayed and you select Cancel without selecting a control solution
level, then No Entry is chosen. The meter stores the control test result along with No Entry and then
the Detailed Control Result screen is displayed.
When the Control Level screen is displayed and you turn off the meter, or if the meter auto-powers
off, without selecting a control solution level, then No Entry is chosen. The meter stores the control
test result along with No Entry.
Other ways to start a control test:
From the Main Menu, select bG Test. Insert a test strip into the meter.
When a reminder notification or the key lock icon is displayed, insert a test strip into the meter.
50813_00048009694_D.indb 68 7/3/12 3:13 PM
Vista de pagina 69
1 2 ... 65 66 67 68 69 70 71 72 73 74 75 ... 281 282

Comentarios a estos manuales

Sin comentarios