
Accu Chek Inform II Blood Glucose Meter Standard Operating
Procedure.
Authorised by: K. Ashton
Signature : ………….
Do not photocopy this document
Page 5 of 14
Last printed: 13 May 2015 ( ward-jones julie (rq6) rlbuht )
1. INTERNAL QUALITY CONTROL TESTING
Quality control testing should be performed to assess the accuracy of the strips and the Accu – Chek
Inform11.
Control tests should be run in the following circumstances:
Once in every 24 hour period.
Using the meter for patient testing for the first time
Each time a new vial of test strips is opened.
When using a new vial of test strips of a different lot number
When the test strips have been exposed to extremes heat, humidity or cold.
If a test strip vial was left open
If questionable test results are displayed repeatedly
To test the performance of the system
If a previous control test is out of range
If glucose control tests were not run at the proper intervals
If the Accu Chek Inform II meter has been dropped.
After the battery has been replaced.
Quality Control Lockout
The meter will only permit a patient test to be performed if quality control testing has been performed and
accepted within the last 24 hrs. If a glucose quality control test is required, the meter will lockout and
prevent patient testing.
In areas where the Accu Chek Inform II is not being used daily, quality control must be performed before
patient testing.
Performing Internal Quality Control
1. Press the Power On/Off button to power on the meter.
2. Touch barcode (top right hand) and scan your Operator ID tag. The Main menu screen is now
displayed.
3. Press the Control Test button and then the Glucose Control Test
4. Press control level to be run
5. Scan Control Solution Lot number
6. If correct, press √
7. Confirm the current strip lot is being used. Or pick the correct one from the list and scan strip pot.
8. When prompted insert a test strip.
9. Apply correct Control solution only when prompted. An hourglass appears while the instrument
performs the test.
10. When the test is complete, the result is displayed either as PASS or FAIL. REMEMBER to add a
comment if the QC fails.
11. Press comments to enter desired comments. i.e. Repeat control
12. Control Hi and Lo must be tested once every 24hrs.
13. The Inform II automatically downloads the QC result into the laboratory’s cobas IT 1000 database.
14. Remove the test strip and dispose of it in accordance with applicable regulations and directives.
15. Turn off the meter and replace into the docking station.
Comentarios a estos manuales